Figure 5 – Wave energy converters developed by COPPE/UFRJ                                                5.2 Tidal energy                         of 2.5 m was considered. The new model
                                                                                                                                                                          eliminates the need to use stop-log gates
                                           a) hyperbaric converter
                                                                                                                                    The  coastal areas  of  Maranhão,  Pará   to control the maximum limit of the res-
                                                                                                                                 and Amapá are the regions with the high-  ervoir. Annual energy production of ap-
                                                                                                                                 est tidal ranges in Brazil. The tidal energy   proximately 14 GWh/year was estimated,
                                                                                                                                 potential of 22 TWh/year was estimated   considering the Kaplan turbine with dual
                                                                                                                                 for the state of Maranhão (NETO  et al.,   regulation supplied by Andritz Hydro (AG-
                                                                                                                                 2017). Some studies have addressed the   GIDIS  et al., 2012). Another study was
                                                                                                                                 exploitation of this energy in Brazil (FER-  carried out by Ferreira and Estefen (2009),
                                                                                                                                 REIRA et al., 2009; NETO et al., 2015). The   considering the restrictions of the Bacanga
                                                                                                                                 10,219-ha estuary of the Bacanga River,   Dam to propose alternatives to be incor-
                                                                                                                                 which includes the estuarine body of wa-  porated into an adaptation project aimed
                                                                                                                                 ter and Lake Bacanga, has a capacity of   at constituting a pilot tidal power plant.
                                                                                                                                 about 40 million cubic meters at a height   The possibility of converting tidal currents
                                                                                                                                 of 4.5 m, corresponding to the tide level   depends on identifying the flow of high
                                                                                                                                 of spring (NETO et al., 2017). The Bacanga   and low tides from in situ measurements
                                                                                                                                 dam has a rocky slope, with an extension   (FERREIRA et al., 2016).
                                                                                                                                 of 800 m, filled with clay material. There
                                      (b) converter with latching control                                                        are two radial and stop-log gate systems   5.2.1 Offshore wind
                                                                                                                                 that were installed in 1974 and 1980 re-
                                    Heave                                                                                        spectively. The three radial gates are ap-  Currently, there are no offshore wind
                                     Stem
                                                                                                                                 proximately 12.5 m wide. In the case of a   turbines installed along the Brazilian coast.
                                 Generator              Topside                                                                  fully open gate, a water level of 4.5 m is   However, according to IBAMA, 23 projects
                                  System
                                                                                                                                 recorded for each radial gate. This value is   have already started the environmental li-
                                                                                                                                 about 3 m for stop-log type gates, which   censing process, with a total installed ca-
                                                          Columns
                                                                                                                                 are flat and work vertically, with widths of   pacity of around 47 GW. Considering an
                                                                                                                                 2.85 m (SHADMAN et al., 2019). Neto et   average capacity factor of 50%, this means
                                                          Bearings                                                               al., proposed a new model for this dam   32% of the national electricity demand in
                                                                                                                                 in which the three radial gates would be   2020. The offshore wind farm projects sub-
                                                                                                                                 replaced  by  others  suitable  for  automat-  mitted to IBAMA are located in the states
                                                          Buoy                                                                   ed operation. A reservoir water level limit   of CE, PI, RN, BA, RJ and RS.

                                                                                                                                 6. Regulatory aspects in Brazil


                                                                                                                                    In Brazil, the concession and licensing   locations where the reservoirs can be ex-
                                                                                                                                 processes for offshore oil and gas and on-  plored. The pre-development phase in-
                                                                                                                                 shore wind by the Brazilian National Agen-  cludes the concession/license of the area to
                                                           Base      Seafloor
                                                                                                                                 cy of Petroleum, Natural Gas and Biofuels   carry out preliminary studies. ANEEL (Na-
                                                                                                                                 (ANP) are based on the bidding system, in   tional Electric Energy Agency) is the regula-
                                                                                 Source:
                                                                                 COPPE/UFRJ                                      which the regulatory body offers specific   tory agency responsible for the concession