Mercosul Itajaí ship performs docking at AMRJ

The docking maneuver of the Mercosul Itajaí vessel, a container ship that has a total length of 194.87 meters and 32.25 meters in width, was carried out at the Rio de Janeiro Navy Arsenal (AMRJ) on February 25th . EMGEPRON actively participated in the Executive Management of the General Maintenance Program of the ship in question, built in 2015, docking being an important step in the current maintenance period, a fundamental process to increase the lifespan of a ship and repair possible existing damage.

English

News

The Naval Project Management Company (EMGEPRON) will present an autonomous vessel project during Operation MINEX-2023, which will take place from October 23rd to 27th.

The ceremony, traditionally called “Keel Laying”, which marks the ship construction process, will begin the materialization of the project for the future Polar Ship “Almirante Saldanha”.

Com o intuito de promover a atividade de controle interno no âmbito do Ministério da Defesa (MD), no dia 04 de outubro foi realizada, em Brasília-DF, a quinta edição do Simpósio Conjunto de Controle Interno do MD.