Mercosul Itajaí ship performs docking at AMRJ

The docking maneuver of the Mercosul Itajaí vessel, a container ship that has a total length of 194.87 meters and 32.25 meters in width, was carried out at the Rio de Janeiro Navy Arsenal (AMRJ) on February 25th . EMGEPRON actively participated in the Executive Management of the General Maintenance Program of the ship in question, built in 2015, docking being an important step in the current maintenance period, a fundamental process to increase the lifespan of a ship and repair possible existing damage.

English

News

On January 20, in the morning, as part of Operation “ASPIRANTEX/2022”, the Commander of Naval Operations, Fleet Admiral Marcos Sampaio Olsen and entourage, accompanied by the Co

A EMGEPRON, representada pelo Assessor de Governança, Conformidade e Integridade, CMG (RM1) Guimarães e pelo Assessor-Adjunto de Compliance e Integridade, Sr. Almir, participou da 2ª Edição do Prêmio da Rede de Governança Brasil (RGB) em Brasília.    A RG

EMGEPRON, represented by the Advisor on Governance, Compliance and Integrity, CMG (RM1) Guimarães and by the Assistant Advisor on Compliance and Integrity, Mr.

From November 20th to December 2nd, 2021, the technical meeting to evaluate the Preliminary Project of the Tamandaré Class Frigates took place at the Thyssenkrupp Marine Systems